Violation Detail
Standard Cited: 19100025 B04 Stairways.
Inspection Nr: 1812503.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Quick Fix
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/01/2025
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 5
Report ID: 0523900
Contest Date:
Final Order: 09/10/2025
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/10/2025 | $0.00 | Serious | ||
Penalty | Z: Issued | 08/01/2025 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.25(b)(4): The employer did not ensure that stairway landings and platforms are at least the width of the stair and at least 30 inches (76 cm) in depth, as measured in the direction of travel. (a) Sawing, outfeed side of Baker bandsaw; On or about March 18, 2025, and dates prior, the top platform of a custom-made metal stairway with integrated platform used to cross over the saw conveyor line was only 8 inches deep.