Violation Detail
Standard Cited: 19260754 E02 III Structural steel assembly.
Inspection Nr: 1811258.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/15/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/09/2025
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 11/21/2025
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/21/2025 | $0.00 | 10/09/2025 | Serious | |
| Penalty | Z: Issued | 09/15/2025 | $0.00 | 10/09/2025 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.754(e)(2)(iii): Metal decking holes and openings were not immediately permanently filled with the equipment or structure needed or intended to fulfill its specific use and strength requirements of paragraph (e)(3) of this section, and/or were not immediately covered: (a) On or about March 17, 2025, on the metal roof of a commercial building under construction, skylight openings were not immediately filled or covered after being cut.
Translate