Violation Detail
Standard Cited: 19260416 A03 General requirements.
Inspection Nr: 1793372.015
Citation: 01001B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $9,457.00
Current Penalty: $0.00
Issuance Date: 04/30/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/27/2025
Gravity: 5
Report ID: 0625400
Contest Date:
Final Order: 05/30/2025
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/30/2025 | $0.00 | 05/27/2025 | Other | |
| Penalty | Z: Issued | 04/30/2025 | $9,457.00 | 05/27/2025 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.416(a)(3): The employer began work without determining if employees could contact any part of an energized circuit and did not post warning signs and advise employees of the location of the circuit, hazards, and protective measures they need to take. North Gate Ranch: On or about December 9, 2024, employees utilized a bull float to install a plug into an underground RCP waste water line without posting warning signs or providing protective measures while performing pressure testing work below 14,400V energized overhead powerlines.