Violation Detail
Standard Cited: 19260600 A06 IV Equipment.
Inspection Nr: 1787476.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,585.00
Current Penalty: $11,585.00
Issuance Date: 05/08/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/16/2025
Gravity: 10
Report ID: 0419400
Contest Date:
Final Order: 05/30/2025
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection | 
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/30/2025 | $11,585.00 | 05/16/2025 | Serious | |
| Penalty | Z: Issued | 05/08/2025 | $11,585.00 | 05/16/2025 | Serious | 
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.600(a)(6)(iv): Where it was difficult for the operator to maintain minimum required clearance by visual means, a person was not designated to observe clearance between equipment and energized power lines, and give timely warning for all operations. a) Oakland market and deli, under powerlines near highway 32 - On or about November 11, 2024, an employee had not been designated to observe the clearance between the overhead power lines and the Geoprobe Model 8150LS, exposing employees to shock hazards.