Powered by GoogleTranslate

Violation Detail

Standard Cited: 19260451 F06 General requirements.

Inspection Nr: 1764156.015

Citation: 01001B

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $0.00

Current Penalty: $0.00

Issuance Date: 10/22/2024

Nr Instances: 1

Nr Exposed: 5

Abatement Date: 10/30/2024

Gravity: 10

Report ID: 0111400

Contest Date:

Final Order: 11/20/2024

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty Z: Issued 10/22/2024 $0.00 10/30/2024 Serious  

Text For Citation: 01 Item/Group: 001B Hazard:

29 CFR 1926.451(f)(6):Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6). Location: Worksite On or about July 25, 2024, employees were exposed to electrical hazards where the employer did not ensure that the scaffolding being used on site, or any conductive material handled on them, maintained the minimum distance of 10 feet established for the live overhead power lines.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close