Violation Detail
Standard Cited: 19260417 B Lockout and tagging of circuits.
Inspection Nr: 1760355.015
Citation: 01001B
Citation Type: Willful
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/19/2024
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 10
Report ID: 0524200
Contest Date: 12/17/2024
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 12/27/2024 | $0.00 | Willful | ||
Penalty | Z: Issued | 11/19/2024 | $0.00 | Willful |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.417(b): The equipment and circuits that are needing to be deenergized were not rendered inoperative and did not have tags attached to all points where such equipment or circuits can be energized. a) On or about July 3, 2024, employees installing communications cable were permitted to work on equipment that was not rendered inoperative and did not have tags attached to all points which could be energized. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.