Violation Detail
Standard Cited: 19100147 C04 II D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1752317.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $7,491.00
Issuance Date: 11/13/2024
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 01/15/2025
Gravity: 5
Report ID: 0524530
Contest Date:
Final Order: 12/09/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/09/2024 | $7,491.00 | 01/15/2025 | Serious | |
| Penalty | Z: Issued | 11/13/2024 | $0.00 | 12/10/2024 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(4)(ii)(D): The energy control procedures did not clearly and specifically outline the requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control On or about June 3, 2024, Employees were exposed to unexpected start-up or release of stored energy while performing servicing and maintenance activities, and the procedures for French Presses D02 and D08 did not specify how to verify the effectiveness of the lockout.