Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1746431.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,372.00
Current Penalty: $0.00
Issuance Date: 08/06/2024
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 08/30/2024
Gravity: 5
Report ID: 0522000
Contest Date:
Final Order: 09/04/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/04/2024 | $0.00 | 08/30/2024 | Serious | |
Penalty | Z: Issued | 08/06/2024 | $10,372.00 | 08/30/2024 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. a) On or about May 7, 2024 the employer did not conduct annual periodic inspections of the energy control procedures including energy control procedures established for the equipment located on Line 30 Extruder. Due to no periodic inspections of the procedures it was not addressed that authorized employees were not isolating the piping system that contained pressurized hot water prior to disconnecting the palletizer motor on the line to change blades.