Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1667266.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/30/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 07/25/2023
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 07/28/2023
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/28/2023 | $0.00 | 07/25/2023 | Serious | |
Penalty | Z: Issued | 06/30/2023 | $0.00 | 07/25/2023 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in 29 CFR 1910.147(d)(1)-(6) and was not done in sequence as required by 29 CFR 1910.147(d). 1). Whirlpool Corporation, on or about April 27, 2023 at the address of 1300 Marion-Agosta Road, Marion OH 43302: The employer failed to ensure established procedures for the application of energy control was done in sequence to ensure the Danly 600 - Ton Tops Line West Press was fully deenergized prior to the servicing/maintenance task. The employee was removing a jammed part without the benefit of fully controlling all potentially hazardous energy. Due to this condition, the employee was exposed to a crush/pinch point hazard.