Violation Detail
Standard Cited: 19100179 N03 I Overhead and gantry cranes.
Inspection Nr: 1651261.015
Citation: 01001B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $9,844.00
Issuance Date: 06/02/2023
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/29/2023
Gravity: 10
Report ID: 0316400
Contest Date:
Final Order: 06/27/2023
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/27/2023 | $9,844.00 | 06/29/2023 | Other | |
| Penalty | Z: Issued | 06/02/2023 | $0.00 | 06/29/2023 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.179(n)(3)(i): The load shall be well secured and properly balanced in the sling or lifting device before it is lifted more than a few inches. (a) Crane CR02; On or about February 13, 2023, The load was not well secured as required as one of the two clamps positioned on the beam did not maintain its hold and became dislodged from the beam.