Violation Detail
Standard Cited: 19100107 B01 Spray finishing using flammable and combustible materials.
Inspection Nr: 1638073.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/27/2023
Nr Instances: 2
Nr Exposed: 3
Abatement Date: 07/28/2023
Gravity: 10
Report ID: 0111100
Contest Date:
Final Order: 05/15/2023
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/15/2023 | $0.00 | 07/28/2023 | Serious | |
| Penalty | Z: Issued | 04/27/2023 | $0.00 | 07/28/2023 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.107(b)(1): The spray booth was not substantially constructed of noncombustible steel, concrete, or masonry materials that were securely and rigidly supported: BlowTherm UltraPrep, Northeast Corner of Workshop - The "Prep Deck" (BlowTherm UltraPrep) enclosure was used as a spray booth and was not constructed of securely and rigidly supported steel, concrete, or masonry materials.