Violation Detail
Standard Cited: 19261404 M02
Inspection Nr: 1637847.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 07/28/2023 2
Initial Penalty: $15,625.00
Current Penalty: $0.00
Issuance Date: 06/05/2023
Nr Instances: 2
Nr Exposed: 20
Related Event Code (REC): A
Gravity: 10
Report ID: 0524530
Contest Date:
Final Order: 06/30/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/30/2023 | $0.00 | 07/28/2023 | Serious | |
Penalty | Z: Issued | 06/05/2023 | $15,625.00 | 06/30/2023 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.1404(m)(2): Upon completion of assembly, the equipment was not inspected to ensure compliance with paragraph (m)(1) of this section (see � 1926.1412(c) for post-assembly inspection requirements): On or about December 6, 2022, a Terex CC2800-1, 660-Ton Crawler Mounted Lattice Boom Crane, was used at Phillips 66 Wood River Refinery to place a Kerosene Hydrotreater Reactor. The SuperLift components and configuration were not inspected upon completion of assembly to ensure compliance with manufacturer specifications.