Violation Detail
Standard Cited: 19260451 G04 I General requirements.
Inspection Nr: 1626396.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $5,801.00
Current Penalty: $0.00
Issuance Date: 11/14/2022
Nr Instances: 1
Nr Exposed: 7
Abatement Date: 12/30/2022
Gravity: 10
Report ID: 0522300
Contest Date:
Final Order: 12/02/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/02/2022 | $0.00 | 12/30/2022 | Serious | |
Penalty | Z: Issued | 11/14/2022 | $5,801.00 | 12/02/2022 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.451(g)(4)(i): Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews. a) On or about October 3, 2022, employees were observed working from scaffolding during the construction of a commercial building located at 3901 Pearl Road, Medina, Ohio 44256; the employer did not ensure employees were protected from a fall hazard of approximately 14 feet by installing a guardrail system along all open sides and ends of platforms.