Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1623602.015
Citation: 01001B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/07/2023
Nr Instances: 1
Nr Exposed: 40
Abatement Date: 03/30/2023
Gravity: 10
Report ID: 0134000
Contest Date:
Final Order: 03/06/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/06/2023 | $0.00 | 03/30/2023 | Other | |
Penalty | Z: Issued | 02/07/2023 | $0.00 | 02/27/2023 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.36(d)(1):Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: Location - Employee Break Room On or about 09/21/2022, employees were exposed to an exit route door with a locking mechanism on the door leading from the break room to the outside; employees trying to evacuate a smoke filled room may be trapped at the exit door.