Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1619056.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,813.00
Current Penalty: $0.00
Issuance Date: 02/09/2023
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 03/06/2023
Gravity: 5
Report ID: 0524500
Contest Date:
Final Order: 03/07/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/07/2023 | $0.00 | 03/06/2023 | Serious | |
Penalty | Z: Issued | 02/09/2023 | $7,813.00 | 03/06/2023 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures had not clearly and specifically outlined the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: On or about September 1, 2022, employees were exposed to the unexpected start-up or release of stored energy while performing servicing and maintenance activities on the Fukui Presses, and the employer had not clearly and specifically outlined the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy.