Violation Detail
Standard Cited: 19100067 C02 VII Vehicle-mounted elevating and rotating work platforms.
Inspection Nr: 1614382.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 03/02/2023 2
Initial Penalty: $3,572.00
Current Penalty: $0.00
Issuance Date: 02/10/2023
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 03/16/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/16/2023 | $0.00 | 03/02/2023 | Serious | |
Penalty | Z: Issued | 02/10/2023 | $3,572.00 | 03/02/2023 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.67(c)(2)(vii): The brakes were not set and outriggers were not positioned on pads or a solid surface. Wheel chocks were not installed before using an aerial lift on an incline. a) 130 Tressler Lane Spring Mills, PA Residential Cabin - Wheel chocks were not installed prior to an employee utilizing a Chevy C5500 Utility Truck which was positioned on an incline., on or about August 10, 2022. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.