Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1614312.015
Citation: 01001B
Citation Type: Other
Abatement Date: 03/06/2023 2
Initial Penalty: $14,063.00
Current Penalty: $0.00
Issuance Date: 01/27/2023
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0521400
Contest Date:
Final Order: 02/23/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/23/2023 | $0.00 | 03/06/2023 | Other | |
Penalty | Z: Issued | 01/27/2023 | $14,063.00 | 03/06/2023 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. On or about August 8, 2022, the employer did not perform periodic inspections on the energy control procedures, such as the BuhlerPrince die cast machine #61, including a review with each authorized employee responsibilities under the energy control procedure. Employees were exposed to amputation and crushing hazards. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).