Violation Detail
Standard Cited: 19100176 B Handling materials - general.
Inspection Nr: 1601440.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/30/2022
Nr Instances: 1
Nr Exposed: 84
Abatement Date: 01/02/2024
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 12/21/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | 11/21/2023 | $0.00 | 01/02/2024 | Serious | |
Penalty | I: Informal Settlement | 12/21/2022 | $0.00 | 01/02/2024 | Serious | |
Penalty | Z: Issued | 11/30/2022 | $0.00 | 12/19/2022 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.176(b): Material stored in tiers was not stacked, blocked, interlocked or limited in height so that it was stable and secure against sliding and collapse: (a) 158 West Jackson Street, New Holland PA, Warehouse Package Storage Area, low bay area doorway: On or about July 14, 2022, pallets containing sheets of cardboard that are later fed into the box maker for making boxes, were stacked 2-4 pallets high and were tilting toward the doorway. The pallets were not stacked, blocked, interlocked or limited in height to prevent them from sliding. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.