Violation Detail
Standard Cited: 19100217 C05 I Mechanical power presses.
Inspection Nr: 1561828.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/08/2022
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): R
Gravity: 10
Report ID: 0521100
Contest Date:
Final Order: 04/20/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/20/2022 | $0.00 | Serious | ||
Penalty | Z: Issued | 04/08/2022 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.217(c)(5)(i): The employer shall use a control system and a brake monitor which comply with paragraphs (b)(13) and (14) of this section; On or about October 28, 2021, the Rousselle Model 10, 110 Ton, Part Revolution Mechanical Power Press did not have a control system and brake monitor installed when employees were required to place hands in die exposing employees to crushing hazards.