Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1515904.015
Citation: 01001B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/09/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/04/2021
Gravity: 1
Report ID: 0521700
Contest Date:
Final Order: 08/03/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/03/2021 | $0.00 | 08/04/2021 | Serious | |
Penalty | Z: Issued | 07/09/2021 | $0.00 | 08/04/2021 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed: a.) Line 3 Rademacher - On or about January 3, 2021, and dates prior to, authorized employees were required to perform service and maintenance on the Line 3 Rademacher machine. The employer failed to certify that periodic inspections of the energy control procedures were performed at least annually as required by the standard. b.) Line 3 Rademacher - On or about February 17, 2021, and dates prior to, authorized employees were required to perform service and maintenance on the Line 3 Rademacher machine. The employer failed to certify that periodic inspections of the energy control procedures were performed at least annually as required by the standard.