Violation Detail
Standard Cited: 19260502 I03 Fall protection systems criteria and practices.
Inspection Nr: 1503872.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 1
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/24/2021
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0418600
Contest Date:
Final Order: 06/03/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 03/24/2021 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.502(i)(3): All covers were not secured when installed so as to prevent accidental displacement by the wind, equipment, or employees: a)Lockheed Martin building under construction around hole/curb of B-3 exhaust fan (Southside); on November 20, 2021 and times prior the employer exposed employees to falls of about 30 feet by not ensuring the cover on the hole was secure enough to prevent accidental displacement by the wind, equipment, or employees.