Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1497189.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/01/2021
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 04/13/2021
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 04/27/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 04/01/2021 | $0.00 | 04/13/2021 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: On or about October 1, 2020, the employer did not ensure that the inspection of energy control procedures on the Weigin Hydromat AL 22 was conducted annually. The machine specific procedure was last inspected in 2016.