Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1456529.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 05/31/2020 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/09/2020
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC): R
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 05/04/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/04/2020 | $0.00 | 05/31/2020 | Serious | |
Penalty | Z: Issued | 04/09/2020 | $0.00 | 04/20/2020 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s). a. The Pullman Company dba Tenneco, Inc. located in Napoleon, OH: On or about January 14, 2020 the employer did not ensure an employee who was performing maintenance on the DA Tank drain to remove an obstruction, properly operated the isolation valve in a manner that prevented the pressurized hot water from exiting the DA Tank. The employee was injured when the pipe blockage cleared and exposed the employee to 220 degree water.