Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1436691.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 12/30/2019 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/03/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): R
Gravity: 5
Report ID: 0521700
Contest Date:
Final Order: 01/09/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 12/03/2019 | $0.00 | 12/30/2019 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1) through (d)(6): a) On or about October 1, 2019, at the end of the Drum Primer Booth, employees were exposed to machine hazards associated with moving parts when required to service and/or maintain the Drum Upender. The employer failed to implement energy control application steps as the machine was not shut down or turned off to perform the servicing work [per the 1910.147(d)(2) requirements]. As a result, the remaining applicable energy control elements, involving machine isolation [(d)(3)], LOTO device application [(d)(4)], dissipation of residual energy [(d)(5)(i)], and verification of isolation [(d)(6)], were not implemented to protect employees from machine servicing hazards.