Powered by GoogleTranslate

Violation Detail

Standard Cited: 19260451 A06 General requirements.

Inspection Nr: 1435046.015

Citation: 01001B

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $0.00

Current Penalty: $0.00

Issuance Date: 03/18/2020

Nr Instances: 1

Nr Exposed: 2

Abatement Date: 05/04/2020

Gravity: 10

Report ID: 0111500

Contest Date: 04/23/2020

Final Order: 10/12/2020

Related Event Code (REC): A;R

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty J: ALJ Decision 10/12/2020 $0.00 05/04/2020 Serious  
Penalty C: Contested 05/11/2020 $0.00 05/04/2020 Serious  
Penalty Z: Issued 03/18/2020 $0.00 05/04/2020 Serious  

Text For Citation: 01 Item/Group: 001B Hazard:

29 CFR 1926.451(a)(6): Scaffold(s) were not designed by a qualified person, and were not constructed and loaded in accordance with that design: Worksite: The wooden vertical support pole spliced with two by fours for the pump jack scaffold was not designed by a qualified person.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.