Violation Detail
Standard Cited: 19100147 C06 I A The control of hazardous energy (lockout/tagout).
Inspection Nr: 1411582.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/25/2019
Nr Instances: 1
Nr Exposed: 15
Abatement Date:
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 12/18/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/18/2019 | $0.00 | Serious | ||
| Penalty | Z: Issued | 11/25/2019 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(6)(i)(A): The periodic inspection of the energy control procedure was not performed by an authorized employee other than the one utilizing the energy control procedure being inspected: a. On or about June 26, 2019, the periodic inspection of the Lockout / Tagout program for the machinery on coating line two was conducted by employees who routinely work on coating line two and or whom performed routine maintenance on the machinery.