Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1394532.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,934.00
Current Penalty: $0.00
Issuance Date: 09/26/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/16/2019
Gravity: 10
Report ID: 0213400
Contest Date:
Final Order: 10/16/2019
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/16/2019 | $0.00 | 10/16/2019 | Serious | |
Penalty | Z: Issued | 09/26/2019 | $11,934.00 | 10/16/2019 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: a. 1200 Airport Road, Unit D, North Brunswick, NJ - Product Development The employer did not conduct annual inspections of energy control procedures. Employees engaged in the cleaning and maintenance of equipment that included, but was not limited to a Kanara tablet compression machine, did not complete lockout/tagout procedures prior to beginning the operation and were not audited at least annually to ensure that the procedures were adequate to control all sources of hazardous energy. Violation occurred on or about April 19, 2019