Violation Detail
Standard Cited: 19100303 F04 General.
Inspection Nr: 1372308.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/05/2019
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 03/14/2019
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 03/27/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/27/2019 | $0.00 | 03/14/2019 | Serious | |
Penalty | Z: Issued | 03/05/2019 | $0.00 | 03/14/2019 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.303(f)(4): Disconnecting means were not capable of accepting a lock in the open position. On or about December 27, 2018, the employer did not ensure that the 480 volt Main Disconnect breaker, used to supply power to Mill #3, was capable of accepting a lock.