Violation Detail
Standard Cited: 19260703 B01 Requirements for cast-in-place Concrete.
This violation item has been deleted.
Inspection Nr: 1367959.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 04/16/2019
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/28/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 03/21/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/21/2019 | $0.00 | 04/16/2019 | Serious | |
Penalty | Z: Issued | 02/28/2019 | $0.00 | 04/16/2019 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.703(b)(1): Shoring equipment (including equipment used in reshoring operations) was not inspected prior to erection to determine that the equipment met the requirements specified in the formwork drawings: a) At the site located at 14900 Chelonia Pkwy, Orlando, FL 32821, the employer did not perform adequate inspections to recognize and correct the use of bolts and brackets being embedded in the shear wall (21). The use of bolts and brackets and not the approved shoring towers that the sealed engineering shoring drawings require, created a collapse hazard of the 7th floor, on or about August 29, 2018.