Violation Detail
Standard Cited: 19100147 C06 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1366401.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $11,366.00
Current Penalty: $0.00
Issuance Date: 03/13/2019
Nr Instances: 1
Nr Exposed: 8
Abatement Date:
Gravity: 5
Report ID: 0111100
Contest Date:
Final Order: 04/04/2019
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/04/2019 | $0.00 | Serious | ||
| Penalty | Z: Issued | 03/13/2019 | $11,366.00 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(6)(i)(B): The periodic inspection of the energy control procedure was not conducted to correct any deviations or inadequacies identified: Catalog Color Prep Basement, Starch Make-Down Tank (#1350) - The group lockout procedure was not updated to include the line supplying Microbiocide Spectrum RX9100 to lines needing to be isolated.
Translate