Violation Detail
Standard Cited: 19260451 D17 General requirements.
Inspection Nr: 1361496.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/30/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0524200
Contest Date:
Final Order: 05/23/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection | 
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/23/2019 | $0.00 | Serious | ||
| Penalty | Z: Issued | 04/30/2019 | $0.00 | Serious | 
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.451(d)(17): Manually operated hoists did not have a positive crank force to descend: a) On or about November 19, 2018, employees were working from a two-point adjustable suspension scaffold where the manually operated hoist did not have a positive crank force to descend. No abatement certification or documentation is required for this item.
Translate