Violation Detail
Standard Cited: 19260961 C02
Inspection Nr: 1347675.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $9,054.00
Issuance Date: 11/05/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 12/03/2018
Gravity: 10
Report ID: 0830600
Contest Date:
Final Order: 12/04/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/04/2018 | $9,054.00 | 12/03/2018 | Serious | |
| Penalty | Z: Issued | 11/05/2018 | $0.00 | 12/03/2018 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.961(c)(2): The employer did not ensure that all switches, dis-connectors, jumpers, taps, and other means through which known sources of electric energy may be supplied to the particular lines and equipment to be de-energized are open and the employer did not render such means inoperable, unless its design does not so permit, and then ensure that such means are tagged to indicate that employees are at work: 1) On September 1, 2018, employees were exposed to shock and electrocution hazards and were not required by the employer to de-energize the 7,200 volt electrical equipment inside a switch box prior to working on or near it.