Violation Detail
Standard Cited: 19260416 A03 General requirements.
Inspection Nr: 1333101.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/02/2018
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 11/19/2018
Gravity: 10
Report ID: 0636900
Contest Date:
Final Order: 11/19/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/19/2018 | $0.00 | 11/19/2018 | Serious | |
Penalty | Z: Issued | 11/02/2018 | $0.00 | 11/19/2018 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.416(a)(3): Before work began, the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring any person, tool, or machine into physical or electrical contact with the electric power circuit: At the Church, the employer did not determine whether the energized electric overhead power lines were located so that the employee's equipment being used would come into contact with the power lines, exposing employees to the hazards of electrocution, electrical shock and/or burns.