Standard Cited: 19260095 A Criteria for personal protective equipment.

Inspection Nr: 1331923.015

Citation: 01001B

Citation Type: Serious

Abatement Status: Corrected During Inspection

Initial Penalty: $0.00

Current Penalty: $0.00

Issuance Date: 09/18/2018

Nr Instances: 1

Nr Exposed: 1

Abatement Date:

Gravity: 10

Report ID: 0112000

Contest Date:

Final Order: 10/01/2018

Related Event Code (REC): R

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 10/01/2018 $0.00   Serious  
Penalty Z: Issued 09/18/2018 $0.00   Serious  

Text For Citation: 01 Item/Group: 001B Hazard:

29 CFR 1926.95(a): Protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, were not provided: On or about 07/18/2018 employees at the North Stonington Public Works solar panel project were exposed to amputation hazards. Employees were operating a Bocker Toplift Hoist without hand protection.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.