Violation Detail
Standard Cited: 19100253 B05 II G Oxygen-fuel gas welding and cutting.
Inspection Nr: 1314991.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/18/2018
Nr Instances: 1
Nr Exposed: 11
Abatement Date: 11/14/2018
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 11/13/2018
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/13/2018 | $0.00 | 11/14/2018 | Serious | |
| Penalty | Z: Issued | 10/18/2018 | $0.00 | 11/14/2018 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.253(b)(5)(ii)(G): Cylinder valves were not closed when the work was finished: a) 2006 Dodge Sprinter - On or about May 9, 2018 and times prior thereto, the valve to an acetylene compressed gas cylinder stored within the rear cargo area of a work van was not closed completely after use. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Translate