Violation Detail
Standard Cited: 19100269 C01 I Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1313494.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/24/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 09/20/2018
Gravity: 10
Report ID: 0627510
Contest Date: 09/19/2018
Final Order: 05/04/2020
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 05/04/2020 | $0.00 | 09/20/2018 | Serious | |
| Penalty | C: Contested | 09/20/2018 | $0.00 | 09/20/2018 | Serious | |
| Penalty | Z: Issued | 08/24/2018 | $0.00 | 09/20/2018 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.269(c)(1)(i): A more extensive job briefing was not conducted where an employee could not be expected to recognize and avoid the hazards involved in the job: On or about May 2, 2018, the employer did not conduct an extensive job briefing to employees performing repair work on an overhead power line. This exposed the employees to electrical hazards.
Translate