Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1309288.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/11/2018
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 06/28/2018
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 05/30/2018
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/30/2018 | $0.00 | 06/28/2018 | Serious | |
Penalty | Z: Issued | 05/11/2018 | $0.00 | 06/28/2018 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): Trojan Battery Company, LLC, Lithonia, GA - In the Oxide Department, Operators performed cleaning of the equipment including lines 1-8, including the reactors and the screw conveyors which had 480 volts electrical and heat energies. Clear specific procedures were not developed, on or about 4/17/18.