Violation Detail
Standard Cited: 19100269 M03 VI Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1281473.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,054.00
Current Penalty: $0.00
Issuance Date: 03/16/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 04/11/2018
Gravity: 10
Report ID: 0729300
Contest Date:
Final Order: 04/10/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/10/2018 | $0.00 | 04/11/2018 | Serious | |
| Penalty | Z: Issued | 03/16/2018 | $9,054.00 | 04/11/2018 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.269(m)(3)(vi): 29 CFR 1910.269(m)(3)(vi): After the applicable requirements in paragraphs (m)(3)(i) through (m)(3)(v) of this section have been followed and the system operator gives a clearance to the employee in charge, the employer did not ensure that the lines and equipment are deenergized by testing the lines and equipment to be worked with a device designed to detect voltage: At the time of the electric shock on 12/1/2017, the "A" single phase regulator was not tested to verify the hazard was removed. An employee received a serious electric shock when he removed a ground connection while the regulator was energized.