Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1269019.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/07/2017
Nr Instances: 4
Nr Exposed: 1
Abatement Date: 02/22/2018
Gravity: 5
Report ID: 0215800
Contest Date:
Final Order: 12/27/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | P: Petition to Mod Abatement | $0.00 | 02/22/2018 | Serious | ||
| Penalty | I: Informal Settlement | 12/27/2017 | $0.00 | 12/22/2017 | Serious | |
| Penalty | Z: Issued | 12/07/2017 | $0.00 | 12/22/2017 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. a) 35 West State St, Sherburne, NY, On or about 10/4/17: The employer failed to develop or document multi energy LOTO procedures for machines listed below: Kuhl Corp equipment washer Egg Cooker Sanovo machine. Multi Vac sealer Dekka packaging snap folder
Translate