Violation Detail
Standard Cited: 19100333 B02 II A Selection and use of work practices
Inspection Nr: 1257647.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 01/12/2018 5
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/02/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0418200
Contest Date:
Final Order: 03/29/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 01/02/2018 | $0.00 | 01/12/2018 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.333(b)(2)(ii)(A): Safe procedures for deenergizing circuits and equipment were not determined before circuits and equipment were denergized. a) Douglassville Rqacetrac Canopy - On or about August 12, 2017 and at times prior, employees were exposed to electrical hazards in that the employer did not develop safe procedures for deenergizing circuits before working on or near them.