Violation Detail
Standard Cited: 19100179 N01 Overhead and gantry cranes.
Inspection Nr: 1230140.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,338.00
Current Penalty: $0.00
Issuance Date: 10/02/2017
Nr Instances: 1
Nr Exposed: 93
Abatement Date: 06/15/2018
Gravity: 5
Report ID: 0728900
Contest Date: 10/27/2017
Final Order: 03/08/2018
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/08/2018 | $0.00 | 06/15/2018 | Serious | |
Penalty | C: Contested | 10/30/2017 | $6,338.00 | 10/13/2017 | Serious | |
Penalty | Z: Issued | 10/02/2017 | $6,338.00 | 10/13/2017 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.179(n)(1): Crane(s) were loaded beyond the rated load (maximum load for which the crane or individual hoist was designed and built by the manufacturer and shown on the equipment nameplate): The employer is failing to protect employees from caught-under and struck-by hazards associated with using floor-operated overhead cranes lift and suspend loads. The most recent occurrence was evident during the inspection conducted on May 4, 2017 at the facility located at 13433 Centech Rd, Omaha, NE 68138. The employer has employees lifting loads greater than the maximum allowable weight annotated on the crane.