Violation Detail
Standard Cited: 19100107 G02 Spray finishing using flammable and combustible materials.
Inspection Nr: 1227862.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 09/11/2017 2
Initial Penalty: $2,173.00
Current Penalty: $0.00
Issuance Date: 08/29/2017
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0523400
Contest Date:
Final Order: 09/22/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/22/2017 | $0.00 | 09/11/2017 | Serious | |
Penalty | Z: Issued | 08/29/2017 | $2,173.00 | 09/11/2017 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.107(g)(2): All spraying areas were not kept as free from the accumulation of deposits of combustible residues as practical, with cleaning conducted daily if necessary: (a) In the paint booth there was an excessive build-up of paint on the ceiling, walls and floor.