Violation Detail
Standard Cited: 19100252 A03 II General requirements.
Inspection Nr: 1226670.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 09/25/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/08/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 10/03/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/03/2017 | $0.00 | 09/25/2017 | Serious | |
Penalty | Z: Issued | 09/08/2017 | $0.00 | 09/25/2017 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.252(a)(3)(ii): All hollow spaces, cavities, or containers were not vented to permit the escape of air or gases before preheating, cutting, or welding was performed. On or about April 19, 2017, at Grid Coordinates: 31.94791581 (-) 93.73709469, Mansfield, LA 71052, the employer allowed employees to perform hot work on an oil tank and failed to vent or purge the oil tanker before cutting.