Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).

Inspection Nr: 1218738.015

Citation: 01001B

Citation Type: Other

Abatement Status: Abatement Completed

Initial Penalty: $7,243.00

Current Penalty: $6,155.00

Issuance Date: 06/21/2017

Nr Instances: 1

Nr Exposed: 1

Abatement Date: 09/28/2017

Gravity:

Report ID: 0523100

Contest Date:

Final Order: 07/11/2017

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 07/11/2017 $6,155.00 09/28/2017 Other  
Penalty Z: Issued 06/21/2017 $7,243.00 07/25/2017 Serious  

Text For Citation: 01 Item/Group: 001B Hazard:

29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) On or about March 7, 2017, LGSTX maintenance employees performed work on the sort conveyor. The energy control procedure had not been inspected annually, exposing employees to potential electrical and mechanical energy.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.