Violation Detail
Standard Cited: 19100333 B02 Selection and use of work practices
Inspection Nr: 1214790.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 06/19/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/02/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): C
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 05/25/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/25/2017 | $0.00 | 06/19/2017 | Serious | |
Penalty | Z: Issued | 05/02/2017 | $0.00 | 06/19/2017 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.333(b)(2): While an employee was exposed to contact with parts of fixed electric equipment or circuits which were deenergized, the circuits energizing the parts were not locked out or tagged or both in accordance with the requirements o-f this paragraph (b) of 29 CFR 1910.333(b)(2): Wave Wash Room: On, or about, February 24, 2017, the circuit breaker provided on the GE Flex-a-Plug mounted on the overhead buss bar was not locked out when the new receptacle project was completed by the Floor Manager. In the alternative, the feed to the buss bar could have been de-energized and locked out.