Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1197243.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/14/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/15/2017
Gravity: 10
Report ID: 0830400
Contest Date:
Final Order: 04/26/2017
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/26/2017 | $0.00 | 06/15/2017 | Serious | |
| Penalty | Z: Issued | 04/14/2017 | $0.00 | 05/10/2017 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedures) did not cover the actions listed in and was not done in sequence as required by 29 CFR 1910.147(d)(1)-(6): (a) Engineered Truss Systems, Inc. at 1400 East Benson Road in Sioux Falls, SD 57104: On and before December 14, 2016 the employer did not ensure the application of energy control was performed prior to repair work on the truss splicer. This condition exposed employees to caught-in hazards. Abatement Note: Abatement certification and documentation is required for this item (see enclosed "Certification of Corrective Action Worksheet")
Translate