Violation Detail
Standard Cited: 19100335 A02 I A Safeguards for personnel protection.
Inspection Nr: 1188375.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 05/24/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/24/2017
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0524700
Contest Date: 05/12/2017
Final Order: 04/09/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/09/2018 | $0.00 | 05/24/2018 | Serious | |
Penalty | C: Contested | 05/16/2017 | $0.00 | 05/17/2017 | Serious | |
Penalty | Z: Issued | 04/24/2017 | $0.00 | 05/17/2017 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.335(a)(2)(i)(A): Fuse handling equipment, insulated for the circuit voltage, was not used to remove or install fuses when the fuse terminals are energized. a. Napoleon Spring Works, Inc. - Archbold, Ohio: On or about October 31, 2016, an employee that removed and installed fuses for a 480 volt electrical panel used to power the punch table in the roll form department was exposed to electrical hazards in that insulated fuse pullers were not utilized.