Violation Detail
Standard Cited: 19100268 J03 Telecommunications.
Inspection Nr: 1187002.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/31/2017
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 04/26/2017
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 04/18/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/18/2017 | $0.00 | 04/26/2017 | Serious | |
Penalty | Z: Issued | 03/31/2017 | $0.00 | 04/26/2017 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.268(j)(3): Vehicle-mounted elevating and rotating work platforms were operated with a conductive part of the equipment closer to exposed energized power lines than the clearances set forth in Table R-2 of this section: (a) On or about October 25, 2016, on the east side of FM 1461, an employee installing telecommunications strand operated a non-insulated, truck-mounted, articulating telescopic aerial lift closer than the minimum approach distance prescribed for an energized overhead power line with a phase-to phase voltage of approximately 24.9 kV.