Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1159065.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/22/2016
Nr Instances: 2
Nr Exposed: 30
Abatement Date: 05/08/2017
Gravity: 5
Report ID: 0112600
Contest Date:
Final Order: 01/13/2017
Related Event Code (REC):
Emphasis:
Substance: 1290
Substance: 1291
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/13/2017 | $0.00 | 05/08/2017 | Serious | |
Penalty | Z: Issued | 12/22/2016 | $0.00 | 05/08/2017 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.119(d)(3)(i)(B): The employer did not include all equipment that was part of the process on piping and instrument diagrams (P&IDs): In the wet end section at 238 Nonotuck Street Florence, MA: On or about September 22, 2016, the employer did not include a sight glass in the P&ID and the sight glass was located between valves FSV30 and FSV31. In the wet end section at 238 Nonotuck Street Florence, MA: On or about September 22, 2016, the employer did not include the emergency shut-off on the P&ID and there was an emergency shut-off in the "doghouse" near the Formaldehyde storage tank and near Mill #5.