Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1130977.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/28/2016
Nr Instances: 2
Nr Exposed: 350
Abatement Date: 12/12/2016
Gravity: 5
Report ID: 0112600
Contest Date:
Final Order: 08/24/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/24/2016 | $0.00 | 12/12/2016 | Serious | |
Penalty | Z: Issued | 07/28/2016 | $0.00 | 12/12/2016 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams (P&IDs) were not accurate and did not represent equipment that was existing and was part of the process. a) In the outdoor, underground propane tank area at 106 Lonczak Drive Chicopee, MA: On or about April 15, 2016, the employer's P&ID of the propane and endothermic gas piping, M-001, was not accurate in that the location of the emergency shut-off valve at the fence of the propane tank area was shown to be between the scrubber and the vaporizer and the shut-off was located between the scrubber and the propane storage tank. b) Along the Northwest exterior wall at 106 Lonczak Drive Chicopee, MA: On or about April 15, 2016, the P&ID did not show a controlled relay on the outside of the Northwest wall of the facility and a controlled relay was in place on the outside of the Northwest wall next to an overhead door which leads out to the propane storage tank area.